Notice: Trail Closures 9/18 & 9/19

With the cooperation of fall weather, both Jeffco Open Space and Clear Creek County will be closing sections of the trail on Monday and Tuesday, 9/18 and 9/19 of 2017.

Access to Peaks to Plains Trail from Mayhem Gulch trailhead will be blocked down from the restrooms and through the underpass for staining and maintenance. In addition, Clear Creek County will be closing their section of the trail from the county line to the west side of the box culvert.

Parking is available at Cannonball Flats and the Oxbow lots. However, if parking at the Oxbow, be advised only about ¾ of a mile of trail will be accessible at this time.

Please plan accordingly and thanks for your patience.

Clear Creek County Section of Trail Closed for Repairs August 7-18, 2017

Peaks to Plains Trail section in Clear Creek County will be closed this week for repairs. Crews will be starting near intersection of 119 & US Hwy 6 to approximately 1/4 mile west. The trail will remain open from the Mayhem Gulch Trailhead west 2 miles to the county line at the intersection of Hwy 119 & US 6. The Oxbow Trailhead on the west side of Tunnel 5, and east approximately 2/3 of a mile around tunnel 5 is still accessible, but the Clear Creek County segment of the trail along the highway will be closed.

The Hard Work Behind the Big Easy

Video

Get a glimpse behind the scenes of the recent US Hwy 6 closure that brought us one step closer to the grand opening of the Big Easy Trailhead in Clear Creek Canyon Park.

US HWY 6 Closure Alert: May 3-4, 2017

Please be aware that US Hwy 6 will be closed between Junctions 58–119 on May 3, 8 p.m. – May 4, 6 p.m. 

Crews will be re-aligning and paving a section of US Hwy 6 near mile marker 262.5 to accommodate a new 50 car parking lot for The Big Easy trailhead access. In addition, the delivery and installation of the fourth Peaks to Plains bridge will be happening simultaneously in the same area. Revisit the first bridge installation.

The development of the Big Easy Recreation Area will include a permanent restroom, among other new amenities like picnic areas and a creek-side boardwalk.

Thanks for the patience!

 

Highway 6 closure May 2017

Closure Alert, Wall Repairs

Closure alert on Peaks to Plains Trail in Clear Creek Canyon Park for Monday April 24 and potentially into Tuesday. Due to rising water levels, trail and wall repairs are being made in the Clear Creek County section starting near intersection of 119 & US Hwy 6 to approximately 1/4 mile west.

Please plan accordingly and be mindful of crews as they work.

Move Over, Highway 6

You might have noticed the recent warm weather has brought about a flurry of construction activity along US Hwy 6 in Clear Creek Canyon. This is all part of another 3/4 mile stretch of the Peaks to Plains Trail and the development of the Big Easy Recreation Area which will include parking for over 50 cars, a permanent restroom, multiple river access points, picnic areas and a new bridge across the creek. To accommodate the new parking lot, and allow for safer creek-side access, US Hwy 6 needs to be moved to the north. With a planned opening date of early September, the crews are working diligently to  physically move the highway to the north of its current location near mile marker 262.5.

Please be patient with on-going lane closures and delays as a result of this work (they will continue off an on for the next month or so). Rest assured the new amenities and recreation area will be worth the wait and loved by visitors for years to come.

Rock face being chipped away

A large rock face needs to be removed to make room for the new highway alignment.

img_1488

The removed rock will be crushed and re-purposed as the road base for new pavement.

Installing nails into bank

The steep slopes above the future highway need to be stabilized using long soil nails, steel mesh, shotcrete, and stone veneer.  Here you can see the drilling equipment installing soil nails.

Stone wall finish

With the wire mesh and shotcrete in place, the future stone veneer allows the wall to blend in with the surrounding area.

new highway

The future highway alignment is beginning to take shape.

Cell tower

The existing cell tower, fiber optic lines and electrical line all need to be moved as well.

Fiberoptic lines being buried

The new lines are encased in concrete for protection.

Buried lines

Before being completely buried, red caution tape is added as a final layer of safety.

 

Partial Trail Closure October – December as Clear Creek County Begins Repairs

Due to high spring runoff from Clear Creek, repairs are needed in a section of trail managed by Clear Creek County. Estimated to take approximately 6 weeks, this closure is located near the intersection of Hwy 119 & US 6. Work will commence on October 31, 2016.

The trail will remain open from the Mayhem Gulch Trailhead west 2 miles to the county line at the intersection of Hwy 119 & US 6. The Oxbow Trailhead on the west side of Tunnel 5, and east approximately 2/3 of a mile around tunnel 5 is still accessible, but the Clear Creek County segment of the trail along the highway will be closed until approximately December 16, 2016. Please refer to the below map for specific route information:

P2P Clear Creek closure Oct-Dec 2016

Click to view and print a larger .pdf of this map

Mandatory Creek Takeout

As part of construction of the Peaks to Plains Trail, there is a mandatory takeout at Cannonball Flats, milepost 261.23.  This will be in place for the entire 2016 season.  There are multiple signs in the creek to alert boaters as well as maps at the put-ins upstream.  The creek is open again below the Big Easy, milepost 262.27.  Please seethe notice below for full details.

Mandatory_takeout June2016_flyer_96dpi

Bridge at Mayhem Gulch Installed

The bridge installation at Mayhem Gulch in Clear Creek Canyon yesterday was successful. The two halves of the bridge were first bolted together, then the two overlook platforms were bolted on, and finally the entire structure was lifted over Clear Creek and into place.

The bridge is not complete and does not have concrete decking. It cannot be walked upon and the Peaks to Plains Trail remains an active construction site.

The next bridge goes in tonight, and the third on Wednesday night. US 6 will be closed to allow for preparation for these two remaining bridges to be staged on the highway. The closures will occur Tuesday March 15 and Wednesday March 16 from 8 P.M. to 3 A.M. See more details about the closures and recommended detour.

CCC_P2P_bridge_install_mayhem_gulch_03-2016 (37)

Bolting the two halves of the bridge together

CCC_P2P_bridge_install_mayhem_gulch_03-2016 (47)

CCC_P2P_bridge_install_mayhem_gulch_03-2016 (41)

Bringing in the overlook platforms

CCC_P2P_bridge_install_mayhem_gulch_03-2016 (54)

Lifting bridge over Clear Creek

CCC_P2P_bridge_install_mayhem_gulch_03-2016 (33)

Final placement of the bridge